|
Jurnal | Terbitan |
Judul |
|
Jurnal Sains Materi Indonesia | OKTOBER 2011 |
UNIQUE CONFORMATION OF RH(I) PILLAR COMPLEXES IMMOBILIZED ON TAENIOLITE |
Sari
PDF (English)
|
Kiky C. Sembiring, Shogo Shimazu |
|
Urania : Jurnal Ilmiah Daur Bahan Bakar Nuklir | Vol 17, No 1 (2011): Februari 2011 |
UNJUK KERJA GENERATOR RADIOISOTOP 99Mo/99mTc DENGAN RADIOAKTIVITAS 99Mo 600 DAN 800 mCi BERBASIS PZC* |
Sari
PDF
|
Kadarisman Kadarisman, Adang HG |
|
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir | Vol 9, No 1 (2012): Juni 2012 |
UNJUK KERJA PENCITRAAN PADA MODUL PENANGKAP CITRA SINAR-X BERBASIS LAYAR PENDAR |
Sari
PDF
|
Istofa Istofa, Sukandar Sukandar, Leli Yuniarsari |
|
Jurnal Pengembangan Energi Nuklir | Vol 20, No 2 (2018): Desember 2018 |
Unjuk Kerja Pengangkutan Penumatik Sistem Small Adsober Sphere Shutdown System untuk Sistem Pemadaman Kedua RDE |
Sari
PDF
|
Denissa Beauty Syahna, Dedy - Priambodo, Guntur Eko Putro |
|
Buletin Alara | Vol 6, No 3 (2005): April 2005 |
UPAYA PENCEGAHAN TERJADINYA “ILLICIT TRAFFICKING” PADA SUMBER RADIOAKTIF |
Sari
PDF
|
B.Y. Eko Budi Jumpeno |
|
SIGMA EPSILON - Buletin Ilmiah Teknologi Keselamatan Reaktor Nuklir | Vol 13, No 1 (2009): Februari 2009 |
UPGRADE SISTEM AKUISISI DATA PADA UUTR |
Sari
|
Kiswanta Kiswanta |
|
PIN Pengelolaan Instalasi Nuklir | Vol 10, No 18 (2017): April 2017 |
UPGRADE SISTEM DETEKTOR PCD KE SDD PADA ALAT XRF QUANT’X IRM |
Sari
PDF
|
Helmi Fauzi R Helmi R., Agus Jamaludin Agus Jamaludin |
|
EKSPLORIUM | Vol 38, No 2 (2017): November 2017 |
Upstream Hydraulic Interconnection Study of Gunungkidul Karst Area Underground Rivers |
Sari
PDF
|
Paston Sidauruk, Satrio Satrio, Evarista Ristin Pujiindiyati, Barokah Aliyanta |
|
Jurnal Pengembangan Energi Nuklir | Vol 6, No 2 (2004): Desember 2004 |
URAIAN UMUM TENTANG TEKNOLOGI DESALINASI |
Sari
PDF
|
Ari Nugroho |
|
Urania : Jurnal Ilmiah Daur Bahan Bakar Nuklir | Vol 22, No 3 (2016): Oktober 2016 |
USE OF MEMBRANE EMULSION SPAN 80 AND TOPO IN URANIUM EXTRACTION AND STRIPPING |
Sari
PDF
|
Kris Tri Basuki, Nurimaniwathy Nurimaniwathy, Dian Puspita, Bambang E H.B |
|
Jurnal Ilmiah Aplikasi Isotop dan Radiasi | Vol 2, No 2 (2006): Desember 2006 |
USING THE N-15 METHOD TO DETERMINE N-SOIL, N-GREEN MANURE, AND N-UREA AVAILABILITY AFTER SIX SEASONS IN AN ALLEY CROPPING SYSTEM |
Sari
PDF
|
Elsje L. Sisworo, Haryanto ., Ania Citraresmini |
|
Widyanuklida | Widyanuklida, Volume 15 Nomor 1, November 2015 |
Usulan Nilai Pembatas Dosis Bagi Pekerja Radiasi dan Peserta Pelatihan di Pusdiklat BATAN |
Sari
PDF
|
Slamet Wiyuniati, Indragini Indragini |
|
Jurnal Sains Materi Indonesia | Vol 20, No 2: JANUARY 2019 |
UTILISATION OF SLAG POWDER FOR CEMENT SUBSTITUTION BASED ON THE COMPRESSIVE STRENGTH AND PENETRATION OF CHLORIDE IONS |
Sari
PDF (English)
|
Yasmina Amalia, Syoni Soepriyanto |
|
Jurnal Sains Materi Indonesia | Vol 20, No 2: JANUARY 2019 |
UTILIZATION OF INDONESIAN LOCAL STANNIC CHLORIDE (SnCl4) PRECURSOR IN THE PROCESS OF MAKING FLUORINE- DOPED TIN OXIDE (FTO) CONDUCTIVE GLASS |
Sari
PDF (English)
|
Tri Arini, Latifa Hanum Lalasari, Lia Andriyah, Gennady Fahmi, F. Firdiyono |
|
SIGMA EPSILON - Buletin Ilmiah Teknologi Keselamatan Reaktor Nuklir | Vol 17, No 1 (2013): Februari 2013 |
VALIDASI DAN KARAKTERISASI FLOW METER E-MAG UNTUK PENGEMBANGAN SISTEM AKUISISI DATA FASILITAS EKSPERIMEN UNTAI UJI BETA |
Sari
PDF
|
Gregorius Bambang Heru |
|
PIN Pengelolaan Instalasi Nuklir | Vol 7, No 14 (2014): Oktober 2014 |
VALIDASI METODA ANALISIS ISOTOP U-233 DALAM STANDAR CRM MENGGUNAKAN SPEKTROMETER ALFA |
Sari
PDF
|
Noviarty ., Yanlinastuti . |
|
PIN Pengelolaan Instalasi Nuklir | Vol 1, No 01 (2008): April 2008 |
VALIDASI METODA PENENTUAN UNSUR RADIOAKTIF Pb-212, Cs-137, K-40 DENGAN SPEKTROMETER GAMMA |
Sari
PDF
|
Noviarty . |
|
GANENDRA Majalah IPTEK Nuklir | Volume 13 Nomor 1 Januari 2010 |
VALIDASI METODE AANC UNTUK PENGUJIAN UNSUR Mn, Mg DAN Cr PADA CUPLIKAN SEDIMEN DI SUNGAI GAJAHWONG |
Sari
PDF
|
Wisjachudin Faisal, Elin Nuraini |
|
Jurnal Forum Nuklir | JFN Vol 2 No 1 Mei 2008 |
VALIDASI METODE AANI DALAM HUBUNGANNYA DENGAN FASILITAS IRADIASI SYSTEM RABBIT RSG-GAS |
Sari
PDF
|
Elisabeth Ratnawati, Theresia Rina M |
|
PIN Pengelolaan Instalasi Nuklir | No 12 (2013): Oktober 2013 |
VALIDASI METODE UJI KEKERASAN MIKRO PADA KELONGSONG ZIRKALOY-4 |
Sari
PDF
|
Hadijaya Hadijaya, Sugondo Sugondo, Djoko Kisworo |
|
GANENDRA Majalah IPTEK Nuklir | Volume 15 Nomor 2 Juli 2012 |
VALIDASI PAKET PROGRAM NODAL3 UNTUK KASUS STATIS BENCHMARK TERAS REAKTOR PWR |
Sari
PDF
|
Tagor Malem Sembiring, Surian Pinem |
|
Jurnal Sains dan Teknologi Nuklir Indonesia (Indonesian Journal of Nuclear Science and Technology) | Vol 15, No 2 (2014): Agustus 2014 |
VALIDASI PEMODELAN KODE FLUENT 6.3 UNTUK PERHITUNGAN ALIRAN PENDINGIN DARURAT DALAM KANAL SEMPIT PLTN-PWR |
Sari
PDF
|
Muhammad Subekti |
|
Jurnal Forum Nuklir | JFN Vol 10 No 2 November 2016 |
VALIDASI PENGUKURAN OSMOLALITAS DENGAN MENGGUNAKAN LARUTAN STANDAR PADA ALAT AUTOMATIC OSMOMETER |
Sari
PDF
|
Amal Rezka Putra, Maskur Maskur, Yayan Tahyan |
|
SIGMA EPSILON - Buletin Ilmiah Teknologi Keselamatan Reaktor Nuklir | Vol 16, No 2 (2012): Mei 2012 |
VALIDASI PROGRAM VSOP PADA PERHITUNGAN DISTRIBUSI TEMPERATUR BAHAN BAKAR RGTT200K KONDISI TUNAK |
Sari
PDF
|
Sudharmono Sudharmono |
|
JURNAL TEKNOLOGI REAKTOR NUKLIR TRI DASA MEGA | Vol 17, No 3 (2015): Oktober 2015 |
VALIDATION OF FULL CORE GEOMETRY MODEL OF THE NODAL3 CODE IN THE PWR TRANSIENT BENCHMARK PROBLEMS |
Sari
PDF
|
Tagor Malem Sembiring, Surian Pinem, Peng Hong Liem |
|
4151 - 4175 of 4206 Item |
<< < 162 163 164 165 166 167 168 169 > >> |