Relationship Between Leadership and Commitment with Quality Performance on U-Th-REE Processing Pilot Plant Construction in BATAN
DOI: http://dx.doi.org/10.55981/eksplorium.2018.4161
Abstract
Management area of leadership and commitment in the quality management system is a mean to achieve successful functions, even more on construction industry. The objective of this research is to analyze the correlation between leadership and commitment focus management area and quality performance as indicated by rework. Research location is uranium (U), thorium (Th), and rare earth elements (REE) processing pilot plant construction area in Center for Nuclear Minerals Technology-BATAN. Primary data were collected from the 36 of 37 submitted questionnaires, and representing 97 % response rate. The research used descriptive analysis, which depends on the poll and the use of Statistical Package for the Social Sciences (SPSS) main program for data analysis. The relationship between leadership and commitment and quality performance was analyzed using spearman rank correlation coefficient. Findings of research provide guideline and alert to project managers or management of organization where leadership, commitment, infrastructure, and environmental work have moderate to strong correlation to rework level. The results further revealed that there is no relationship between responsibility and authority for the management system and organizational policy and construction quality performance. The research provides evidence, in fact to achieve the quality performance of a pilot plant construction must be concerned with leadership attribute, maintaining commitment and provide support resources on the whole project cycle.
Area manajemen kepemimpinan dan komitmen dalam sistem manajemen mutu adalah sarana untuk mencapai keberhasilan suatu pekerjaan, terlebih pada industri konstruksi. Tujuan dari penelitian ini adalah untuk menganalisis hubungan antara area fokus manajemen kepemimpinan, komitmen, dan kinerja kualitas yang ditunjukkan dengan pengerjaan ulang (rework). Lokasi penelitian adalah area kontruksi pilot plant pengolahan uranium (U), torium (Th), dan unsur logam tanah jarang (LTJ) di Pusat Teknologi Bahan Galian Nuklir-BATAN. Data primer merupakan hasil 36 dari 37 kuisioner yang dikirimkan, dan mewakili tingkat respons 97 %. Penelitian ini menggunakan analisis deskriptif, yang bergantung pada polling dan menggunakan program utama Paket Statistik untuk Ilmu Pengetahuan Sosial (SPSS) untuk analisis data. Hubungan antara kepemimpinan dan komitmen dan kinerja kualitas dianalisis dengan menggunakan koefisien korelasi pemeringkatan spearman. Hasil penelitian memberikan panduan dan peringatan kepada manajer proyek atau manajemen organisasi bahwa kepemimpinan, komitmen, dan infrastruktur serta lingkungan kerja memiliki korelasi menengah hingga sangat kuat terhadap tingkat pengerjaan ulang. Hasil lainnya mengungkapkan bahwa tidak ada hubungan antara tanggung jawab dan wewenang sistem manajemen serta kebijakan organisasi dengan kinerja kualitas konstruksi. Penelitian ini memberikan bukti bahwa sebenarnya untuk mencapai kinerja kualitas konstruksi pilot plant harus memperhatikan atribut kepemimpinan, mempertahankan komitmen, dan memberikan sumber daya pendukung pada keseluruhan siklus proyek.
Keywords
Full Text:
PDFReferences
[1] IAEA, “Construction for Nuclear Installations,” p. 68, 2015.
[2] R. Basu, “Managing quality in projects: An empirical study,” Int. J. Proj. Manag., vol. 32, no. 1, pp. 178–187, 2014.
[3] K. N. Jha and K. C. Iyer, “Critical factors affecting quality performance in construction projects,” Total Qual. Manag. Bus. Excell., vol. 17, no. 9, pp. 1155–1170, 2006.
[4] J. Wanberg et al., “Relationship between Construction Safety and Quality Performance,” J. Constr. Eng. Manag., vol. 139, no. 10, pp. 04013003–1–04013003–10, 2013.
[5] P. E. D. Love, “Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects,” J. Constr. Eng. Manag., vol. 128, no. 1, pp. 18–29, 2002.
[6] D. Kim, V. Kumar, and U. Kumar, “A performance realization framework for implementing ISO 9000,” Int. J. Qual. Reliab. Manag., vol. 28, no. 4, pp. 383–404, 2011.
[7] E. K. Zavadskas, A. Juozapaitis, J. Tamošaitiene, and Z. Turskis, “Leadership Strategy Selection in Construction Industry,” Procedia Eng., vol. 122, no. Orsdce, pp. 191–195, 2015.
[8] N. C. Skeepers and C. Mbohwa, “A Study on the Leadership Behaviour, Safety Leadership and Safety Performance in the Construction Industry in South Africa,” Procedia Manuf., vol. 4, no. Iess, pp. 10–16, 2015.
[9] L. Zhang, T. Cao, and Y. Wang, “The mediation role of leadership styles in integrated project collaboration: An emotional intelligence perspective,” Int. J. Proj. Manag., vol. 36, no. 2, pp. 317–330, 2018.
[10] M. Liphadzi, C. Aigbavboa, and W. Thwala, “Relationship between Leadership Styles and Project Success in the South Africa Construction Industry,” Procedia Eng., vol. 123, pp. 284–290, 2015.
[11] R. Müller and R. Turner, “The Influence of Project Managers on Project Success Criteria and Project Success by Type of Project,” Eur. Manag. J., vol. 25, no. 4, pp. 298–309, 2007.
[12] G. H. Jarad, “The construction manager leading characteristics for the success of construction projects in the Gaza Strip,” The Islamic university of Gaza, 2012.
[13] K. G. Burns, N. & Grooves, “The practice of Nursing Research Conduct, Critique and Utilizationle,” Second Edi., Philadelphia: WB Saunders Company, 1993.
[14] C. R. Kothari, Research Methodology: Methods and Techniques. New Age International (p) Ltd, 2008.
[15] W. Oruma, “Factors Influencing Implementation of Total Quality Management in Construction Companies in Kenya : a Case of Nakuru County,” 2014.
[16] C.A. Moser and G. Kalton, Survey Methods in Social Investigation, Second edi. Aldershot: Dartmouth Publishing Company Ltd, 1971.
[17] M. M. Mukaka, “A guide to appropriate use of Correlation coefficient in medical research.,” Malawi Med. J., vol. 24, no. 3, pp. 69–71, 2012.
[18] Anonim, “p_values.” [Online]. Available: https://www.statsdirect.com/help/Default.htm#basics/p_values.htm. [Accessed: 14-Mar-2018].
[19] T. W. Loushine, P. L. T. Hoonakker, P. Carayon, and M. J. Smith, “Quality and Safety Management in Construction,” Total Qual. Manag. Bus. Excell., vol. 17, no. 9, pp. 1171–1212, 2006.
[20] Lyndsay T Wilson, “Statistical Correlation,” 2009. [Online]. Available: https://explorable.com/statistical-correlation. [Accessed: 14-Mar-2018].
[21] S. Nickolas, “What Does it Mean if the Correlation Coefficient is Positive, Negative, or Zero?,” 2017. [Online]. Available: https://www.investopedia.com/ask/answers/032515/what-does-it-mean-if-correlation-coefficient-positive-negative-or-zero.asp. [Accessed: 13-Mar-2018].
[22] J. M. Dougherty, L. Ap, J. G. Zack, N. Hughes, and L. Ap, “THE IMPACT OF REWORK ON CONSTRUCTION & SOME PRACTICAL REMEDIES,” no. August, 2012.
[23] V. D. P. Simamora, “Analisa penerapan..., Vega Dinata Partogi Simamora, FT UI, 2014.,” Indonesia University, 2014.
Refbacks
- There are currently no refbacks.
Copyright EKSPLORIUM: Buletin Pusat Pengembangan Bahan Galian Nuklir (e-ISSN 2503-426x p-ISSN 0854-1418)
National Research and Innovation Agency (BRIN), KA. B.J. Habibie, Jl. M.H. Thamrin No.8, Jakarta, 10340, Indonesia.