STUDI DAN DESAIN SISTEM PENDINGIN UNTUK INSTALASI DEKONTAMINASI ELEKTROLITIK BERSKALA LAB

Ratiko Ratiko

Sari


STUDI DAN DESAIN SISTEM PENDINGIN UNTUK INSTALASI DEKONTAMINASI ELEKTROLITIK BERSKALA LAB. Telah dilakukan penelitian, kalkulasi serta desain beberapa sistem pendingin untuk instalasi dekontaminasi elektrolitik. Sistem pendingin diperlukan karena efisiensi optimal instalasi bisa dicapai pada temperatur tertentu. Dari kalkulasi dan desain instalasi dekontaminasi elektrolitik berskala laboratorium di PTLR BATAN Serpong diperoleh kapasitas pendingin yang diperlukan instalasi adalah 308,45 Watt, debit masa fluida pendingin (R22) pada temperature evaporasi 20C sebesar 7,45 kg/h, dan debit masa air pendingin pada ΔT = 200C sebesar 12,86 kg/h. Dari berbagai konsep sistem pendingin yang ada, sistem refrigerasi absorpsi dan sistem refrigerasi kompresi uap merupakan sistem pendingin yang sesuai untuk instalasi dekontaminasi elektrolitik. Biaya investasi sistem pendingin absorpsi memang 1,5 hingga 2 kali lebih besar disbanding sistem refrigerasi kompresi uap, namun sistem refrigerasi absorpsi untuk instalasi dekontaminasi elektrolitik berskala 227 liter (dapat mengolah limbah 120 m3 per tahun) mampu menghemat sebesar 13,2 kW tiap satu jam operasi. STUDY AND DESIGN OF COOLING SYSTEM FOR ELECTROTILYTIC DECONTAMINATION INSTALLATION ON LAB SCALE. Some cooling concepts for the electrolytic decontamination plant have been investigated and designed. Cooling system is needed, due to the fact that the optimally efficiency will be reached in the certain anolyte temperature. From the calculation and simulation (based on the lab scale electrolytic decontamination plant in PTLR-BATAN Serpong), it obtained that the cooling capacity of evaporator is 308,45 Watt, the mass flow of refrigerant (R22) at the evaporating temperature of 20C is 7,45 kg/h, the mass flow of chilled water at ΔT = 20 K is 12,86 kg/h. The absorption refrigeration and compression refrigeration system are favorable for the electrolytic decontamination plant. The installed cost for absorption system is 1.5 - 2 times higher than compression system, but the absorption system of 227 litre electrolytic decontamination plant (for 120 m3 waste capacity) could save operating cost of 13,2 kW per hour.

Teks Lengkap:

Tidak berjudul

Refbacks

  • Saat ini tidak ada refbacks.
?>
slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor