MODIFIKASI PEMIPAAN SISTEM PEMBUANGAN LIMBAH CAIR AKTIVITAS RENDAH (KPK01)

Santosa Pujiarta, Bambang Murjati

DOI: http://dx.doi.org/10.17146/bprn.2013.10.1.684

Sari


Permasalahan utama dari instalasi nuklir adalah pengelolaan limbah radioaktif dari hasil proses produksi, penelitian, dan limbah dari dampak daerah kerja. Di Pusat Reaktor Serbaguna (PRSG) limbah radioaktif telah dikelola dengan baik. Limbah radioaktif dengan aktifitas rendah dikirim ke instalasi pengolahan limbah di Pusat Teknologi Limbah Radioaktif (PTLR) untuk diolah dan disimpan, sehingga aman untuk lingkungan. Sistem pengiriman limbah cair radioaktif dilakukan menggunakan mobil tangki limbah, namun karena mengalami kendala dalam pengelolaan kendaraan angkut dan mengingat segi keselamatan pengiriman. Selanjutnya sistem pengiriman limbah diubah menggunakan jalur pemipaan bak terpadu (PBT) yang terhubung dengan instalasi nuklir lain yang berada di kawasan Puspiptek, dimana pipa pengiriman limbah dihubungkan menggunakan selang menuju saluran limbah terpadu melalui pintu keluar darurat. Karena cara ini mempengaruhi tekanan negatif di dalam gedung reaktor maka sambungan selang penghubung dimodifikasi menggunakan sambungan pipa permanen dari bahan pipa SS 316 dengan diameter 2 inch yang dipasang di lorong pipa pendingin sekunder. Setelah dilakukan modifikasi sistem pengiriman limbah cair radioaktif menjadi lebih mudah, aman dan tidak mempengaruhi tekanan negatif di dalam gedung reactor. Kata kunci : modifikasi, pemipaan, limbah, radioaktif The main problem of operation of nuclear installation is to manage radioactive waste developed during process production, research and waste coming from working area. Radioactive waste produced from the RSG-GAS operation is managed in proper ways. Low activity radioactive waste, contained using special transport container, is transferred to the Center for Radioactive Waste Technology for processing and storing by means of transport vehicle. Due encountering difficulties to manage transport vehicle and considering safety aspect during waste from radioactive waste pool storage at the reactor building to integrated pool storage waste at the PUSPIPTEK Area through emergency piping system. Using this method is realized that negative pressure system inside the reactor building is disturbed. To solve this problem therefore, hose connection was modified using permanent pipe connection made of SS 316 diameter of 2 inch and it is installed in secondary coolant pipe channel. After modification, it is deemed that the negative pressure inside reactor building can easily be maintained then radioactive waste disposal is accomplished more practical and safe.Keywords: modifications, piping, waste, radioactive

Teks Lengkap:

PDF

Refbacks

  • Saat ini tidak ada refbacks.


##submission.copyrightStatement##



Reaktor : Buletin Pengelolaan Reaktor Nuklir bekerjasama dengan:

     Creative Commons License 

slot gacor slot