PENGARUH GANGGUAN LISTRIK TERHADAP OPERASI RSG-GAS TERAS 61

Teguh Sulistyo

Sari


THE INFLUENCE OF ELECTRIC FAILURE TO THE OPERATION OF RSG-GAS CORE 61. The system of RSG-GAS electricity is designed for supplying the various of electrics loads, voltages and safety classification of components. The electrics resource were supplied by PLN, emergency gensets and batteries. The failure of main electricity supply PLN is detected by emergency bus bars system BNAIBNBIBNC through the Main Control Room (MCR) monitoring system. This failure has an impact on the primary coolant system operation, secondary coolant system, emergency power supplies BRV 10/20130. It the PLN electric supply failed during reactor operation, the reactor will scram and automatically shutdown to fulfilled the reactor safety criterion

PENGARUH GANGGUAN LISTRIK TERHADAP OPERASI RSG-GAS TERAS
KE 61. Sistem kelistrikan RSG-GAS dirancang untuk mampu memasok berbagai jenis be ban listrik, jenis tegangan dan klasifikasi keselamatan. Sumber daya listrik yang memasok kebutuhan listrik RSG-GAS disuplai dari tiga jenis sumber yaitu daya listrik utama PLN, daya Iistrik darurat genset dan baterai. Kegagalan suplai daya listrik utama PLN yang terjadi pada operasi RSG-GAS teras ke 61 dideteksi oleh sistem busbar darurat
BNAIBNB/BNC melalui RKU yang dimonitor oleh sistem keselamatan reaktor. Gangguan terhadap suplai daya listrik utama tersebut dapat berpengaruh terhadap operasi sistem pendingin primer, sistem pendingin sekunder, sistem purifikasi dan sistem penyedia daya darurat BRVIO/20/30 dan jika gangguan tersebut terjadi pada saat reaktor sedang beroperasi dapat mengakibatkan reaktor scram dan shutdown secara otomatis sehingga kriteria keselamatan dipenuhi


Teks Lengkap:

PDF

Refbacks

  • Saat ini tidak ada refbacks.